MALAYSIA

JOHOR

Positioned at the heart of Asia’s fastest-growing digital corridor, Johor offers cost-effective scalability alongside direct access to Singapore’s mature digital ecosystem and subsea cable networks. This unique combination makes Johor an attractive destination for hyperscalers and cloud providers seeking efficient expansion in Southeast Asia.

PROJECTS

JHR04

KULAI, JOHOR

RFS Date

2025

IT Capacity

24 MW

K2’s largest campus footprint with 234MW of designed IT capacity, the first 40MW IT load was operational within 11 months in 2024.

JHR01-03

KULAI, JOHOR

RFS Date

2024

IT Capacity

60 MW

K2’s largest campus footprint with 234MW of designed IT capacity, the first 40MW IT load was operational within 11 months in 2024.